Swan River 300m Riverwall Replacement – Rock Revetment
- Construction of a new reconstituted limestone block riverwall and limestone rock revetment to replace an existing concrete riverwall on the South Perth Foreshore.
- Preparation and implementation of appropriate management plans (Swan River Trust)
- Due to the constraints of the site a careful approach was required Pedestrian, cyclist and traffic management
- Mobilisation and site preparation as required with ASS bunds & refuelling bunds constructed
- Clearing and excavation as required
- Management of Dewatering & Environmental elements were paramount
- Confirmation of foundations and geotechnical conditions.
- Supply, delivery and placement of new reconstituted limestone blocks and materials, quarry products, reinforced concrete footing materials, drainage pipe, concrete path and all other materials necessary to complete the works.
- Tie-in to existing structures.
- Demobilisation and site clean-up, including any reinstatements as required.
- Crushing all existing concrete wall & path reusing in rear of the new wall
- Winner CCF Award